Installing Bion at the Living Arts of Tulsa

In essence, we needed two full days to do the installation. This was made possible by all the extra help, the low ceilings, and our having resolved many of our wire storage and power issues.

Day 1

Day 2

View above the ceiling...

View below...

Full Installation


fagg@ou.edu

Last modified: Fri Sep 8 13:55:51 2006